Roads & Highways
1- Engineering Design and Tender Documents of Arz-El Masaad, and Karmalieh-Sahet EL Saydeh Roads.
2004 - Ongoing
NAME OF CLIENT: Ministry of Public Works and Transportation / TI
VALUE OF CONSTRUCTION Million US $: 4
The services covered data collection, detailed reconnaissance, road line diagram, environmental reconnaissance and impact assessment, topography, traffic modeling, traffic count and classification, geotechnical investigation and report, hydrological and drainage design, structural design including design of bridges, survey of historical monuments in the project area, detailed road design, design of intersections, pavement design, electrical design and lighting, signaling and signage, landscaping, land expropriation, rerouting of existing underground utilities. The deliverables includes preliminary design report, final design report, design calculation notes, environmental impact assessment report, economical feasibility report, cost estimates, and complete tender documents including Conditions of Contract, Bills of Quantities, Drawings, and specifications.
Top
2- Engineering Design and Tender Documents of Corniche Rachid Karami-Kalaat Tarablous-Khazanat, Zgharta-Makhada-Merdachiye, Aamriye Mounjez-Chadra-Bqaiaa Roads.
2004 - 2006
NAME OF CLIENT: Ministry of Public Works and Transportation
VALUE OF CONSTRUCTION Million US $: 15

The services covered data collection, detailed reconnaissance, road line diagram, environmental reconnaissance and impact assessment, topography, traffic modeling, traffic count and classification, geotechnical investigation and report, hydrological and drainage design, structural design including design of bridges, survey of historical monuments in the project area, detailed road design, design of intersections, pavement design, electrical design and lighting, signaling and signage, landscaping, land expropriation, rerouting of existing underground utilities. The deliverables includes preliminary design report, final design report, design calculation notes, environmental impact assessment report, economical feasibility report, cost estimates, and complete tender documents including Conditions of Contract, Bills of Quantities, Drawings, and specifications.

Top
3- Ras Masqa Highway Access
2004 - 2005
NAME OF CLIENT: Ministry of Public Works and Transportation
VALUE OF CONSTRUCTION Million US $: 1.00

Top
4- Supervision of Road Construction and Maintenance in the Caza of Dinnieh
2002 - 2005
NAME OF CLIENT: Ministry of Public Works and Transportation
VALUE OF CONSTRUCTION Million US $: 2.00

The services covered supervision of the construction works for the rehabilitation and maintenance of roads in the Caza of Dinnieh. Material testing of Asphalt and aggregate base course. Preparation of progress reports. Preparation of invoices. Coordination with the Client, local authorities and other Contractors working in the area.

Top
5- Engineering Design of Haizouq – Souaisse Road in the Caza of Akkar
2003 - 2004
NAME OF CLIENT: Ministry of Public Works and Transportation
VALUE OF CONSTRUCTION Million US $: 0.50

The services covered Data collection, detailed reconnaissance, topography, hydrological and drainage design, geometric and pavement design, and land expropriation. Preparation of a Final Design Report including Bills of Quantities and Drawings.

Top
6- Design of Road Construction and Maintenance in Halba
2002 - 2003
NAME OF CLIENT: Municipality of Halba
VALUE OF CONSTRUCTION Million US $: 6

The services covered data collection, detailed reconnaissance, topography, traffic count and classification, hydrological and drainage design, detailed road design, design of intersections, pavement design, electrical design and lighting, signaling and signage. Preparation of tender documents including Conditions of Contract, Bills of Quantities, Drawings, and specifications.

Top
7- Interchanges at Jordan University of Science and Technology Project - Jordan
2001 - 2003
NAME OF CLIENT: Ministry of Public Works and Housing
VALUE OF CONSTRUCTION Million US $: 2.8

Supervision of construction of main highway and interchanges at Jordan University of Science and Technology Project. The work comprises of the construction of 1.7 kms primary 4-lane divided road, three interchanges, drainage structures and other related works.

Top
8- Irbid – North Shuna Highway – Section - Jordan
2001 - 2003
NAME OF CLIENT: Ministry of Public Works and Housing
VALUE OF CONSTRUCTION Million US $: 13

The supervision of construction of a 12 kms long four lane divided highway including bridges, underpasses, drainage structures and reinforced concrete retaining walls.
Quantities involved in the above works:

Earthworks : 2,800,000 cu.m.
Embankment Construction : 1,200,000 cu.m.
Base & Subbase courses : 160,000 cu.m.
Asphalt Binder & Wearing Courses : 600,000 sq.m.
Concrete for bridge, trumpet interchange : 4,900 cu.m.
Concrete for underpasses : 1,300 cu.m.
Grouted Riprap : 13,000 cu.m.
Steel Guard rails and New Jersey Barriers : 12,000 l.m.

Top
9- Al-Balqa’ Applied University – Roads in The Faculty of Agriculture - Jordan
2000 - 2002
NAME OF CLIENT: Al-Balqa’ Applied University
VALUE OF CONSTRUCTION Million US $: 17
The Faculty of Agriculture is part of many faculties for Al Balqa’ Applied University, it is distributed over a 100 acres land overlooking the Jordan Valley.


The project consists of designing a main road, 2.5 km length inside the borders of the faculty connecting all the facilities with the main road outside the site.

Five service roads, around 1 km length, are branches from the main road to serve the movement between the faculties and research centers with the Faculty of Agriculture.

Top
10- Zarqa Free Zone Intersections Jordan - 2000
2000 - 2002
NAME OF CLIENT: Ministry of Public Works and Housing - Jordan
VALUE OF CONSTRUCTION Million US $: 14

The study, preliminary and final design and tender documents of the three entrances for Zarqa Free Zone and the Section of Main Road infront of the Free Zone.

A traffic study was conducted on the Main Road and the locations of entrances/exists to Zarqa Free Zone to determine the existing classification of traffic and the traffic forecast for next 20 years. The traffic study comprised manual and automatic volume classification counts, Origin – Destination Survey and axle load measurements.

The Project comprises upgrading the Main Road, 7.5 km in length, Two lanes of width 9.00 m and shoulder 3.00 m infront of the Free Zone, separating through traffic from the traffic diverting to the Free Zone by means of an R.C. underpass of width 9 m, (two lanes) height of 5.5 m and length of 1.5 m infront of the Main Gate and at grade intersection infront of the entrance gate for the trucks entering the Free Zone.

Top