| 1- Design and Supervision of the Rehabilitation of Tripoli Potable Water Network | | 2004 - Ongoing | | NAME OF CLIENT: Ondeo Liban s.a.l. (Tripoli Water Authority) | | VALUE OF CONSTRUCTION Million US $: 7.15 | |
The services covered the detailed design and supervision for the construction of 77 Kms of secondary and tertiary distribution networks, 5315 service connections, and 35330 water meters. It included the preparation of feasibility study, investigation and data collection, topographic survey, hydraulic design including computer modeling for the whole network, preparation of detailed design and engineering drawings, land expropriation, environmental assessment, final design report and tender documents, preparation of documents for pre-qualification of contractors.
Services for the supervision of the construction works include: daily supervision of the works, follow up on expropriation files, review and approve contractor’s submittals, prepare regular progress reports, testing and commissioning of the facilities, review and approve O & M manuals and As-Built Drawings.
| | Top |
|
| 2- Preliminary study of the Tripoli Water Works | | 2003 - 2005 | | NAME OF CLIENT: Ondeo Liban s.a.l. (Tripoli Water Authority) | | VALUE OF CONSTRUCTION Million US $: 15 | |
The services covered inventory of the assets of the Tripoli Water Authority, evaluation of water demand and water resources, assessment of water quality, preparation of hydraulic schematics for the current situation, identification of projects, preliminary study and cost estimates, prioritizing projects, and preparation of implementation schedules for the design, tendering, and construction.
| | Top |
|
| 3- Technical Review of The Euphrates River And The Tigris River Water Resource Management. | | 2003 - 2005 | | NAME OF CLIENT: Nordic Consulting Group | | VALUE OF CONSTRUCTION Million US $: 350.00 | |
Technical review of the preliminary and detailed study plan for the optimum use of the Euphrates and Tigris Rivers for potable water and irrigation. The Final Report included the following:
General Overview 1. Rivers Basin Description 2. Major Development Projects on the Rivers’ Watercourses 3. An Overview of the Euphrates and Tigris in the Context of Water Disputes 4. International Water Law in the Euphrates-Tigris Case – Prospects for Cooperation
Assessment of the Study’s Economic Analysis and Simulation Models 1. Economic Efficiency of Water – The Euphrates River in Turkey 2. Assessment of the Study Power Production and River Discharge Models 3. Assessment of the Documented Water Quality Data 4. Assessment of the Study Water Quality Modeling
UNEP Monitoring of Environmental Change in the Euphrates and Tigris Basin
Conclusions, Recommendations, and Proposals 1. General Proposals of the Study 2. Pitfalls of the Performed Study 3. Drawing Lessons of Water Quality Management from Existing Treaties 4. Opportunities for Cooperation under International Law 5. Recommendations
| | Top |
|
| 4- Chlorination Stations Condition Assessment | | 2003 - 2004 | | NAME OF CLIENT: Ondeo Liban s.a.l. (Tripoli Water Authority) | | VALUE OF CONSTRUCTION Million US $: 0.20 | |
| | Top |
|
| 5- EELN Capital Investment Program | | 2003 - 2004 | | NAME OF CLIENT: Ondeo Liban s.a.l. (Tripoli Water Authority) | | VALUE OF CONSTRUCTION Million US $: 40 | The proposed action plan included the integration of the wastewater services into the present services of the different water authorities through a proposed investment program for every water authority that covers all components of the hydraulic system. | | Top |
|
| 6- Water Distribution Network Development And Rehabilitation Works In Baniyas, Mussaffah And Al Nahda Al Jadeeda | | 1995 - 1998 | | NAME OF CLIENT: Government of Abu Dhabi Water and Electricity Department | | VALUE OF CONSTRUCTION Million US $: 3.1 | | The preliminary and final design and supervision of construction of this multi-million dollar project. The project entailed the design of new water supply networks for the areas of Mussaffah, Baniyas and Al Nahda Al Jadeeda in Abu Dhabi. The project consisted of the design and construction of over 30 kms of water transmission and distribution pipelines ranging in diameter from dia 100mm to dia 600mm including all ancillary gate valves, butterfly valves, and bulk flow meters and chambers. The project also included over 1800 house connections with water meters, stopcocks and house connection pipework. This project is a 3 years duration project with a construction cost of 3.1 million USD. | | Top |
|
| 7- Dubai Water System Leakage Detection & Water Network Restitution Projects Rc1, Rc2 And Rc2 Dubai (U.A.E.) - 1991-1997 | | 1991 - 1997 | | NAME OF CLIENT: Dubai Electricity and Water Authority | | VALUE OF CONSTRUCTION Million US $: 39.1 | The preliminary final design and contract documents and supervision of construction of this multi-million dollar project in Dubai. The project entailed the design and construction of over 330 kms of water supply transmission and distribution pipelines for the city of Dubai.
The pipe diameters ranged from dia 100 to dia 600mm and included the construction of butterfly and gate valve chambers as well as magnetic and ultrasonic bulk flow meters. The project also included the construction of over 30 thousand house connections including water meters, stopcocks and house connection pipework. This project was a 6 year duration project with a construction cost of 39.1 million USD. | | Top |
|
| 8- Hydraulic Analysis of Water Systems in Zarqa District, Jordan | | 1994 - 1996 | | NAME OF CLIENT: Ministry of Water, & Irrigation, Water Authority, Jordan and Japan International Corporation Agency Study Team represented by Tokyo Engineering Consultant | | VALUE OF CONSTRUCTION Million US $: 15 | | Detailed field investigation and data collection to produce existing system layouts drawings of the distribution system for Zarqa District, an area of about 62.3 Sq.km and a population of 540,000 people in 1994. A detailed Network Analysis producing hydraulic modelling, to improve the efficiency of the Systems was carried out. Also a complete study of the unaccounted for water and leakage control was done on several pilot areas. | | Top |
|
| 9- Water Distribution Network Development and Rehabilitation Works in Baniyas, Wathba, Mafraq, Mussaffah and Al-Nahda Al-Jadeeda - Abu Dhabi - U.A.E. | | 1994 - 1996 | | NAME OF CLIENT: Water and Electricity Department, Abu Dhabi | | VALUE OF CONSTRUCTION Million US $: 5.18 | |
The Preliminary and Final Designs and Supervision of Construction of New Water Networks in Mussaffah Sector ME1 - 9 & 13 & MW 4 and in Al Nahda Al Jadeedah, as well as Rehabilitation of the Network in Baniyas. Length of water networks is 50 kms serving a population of 70,000.
The new networks included population projections and the water demands of each sector as well as designing the new water networks which included the designs of the Mains and House Connections.
| | Top |
|
| 10- Master Plan for Water Supply to Dubai City - U.A.E. | | 1991 - 1992 | | NAME OF CLIENT: Dubai Water Department, Dubai, U.A.E. | | VALUE OF CONSTRUCTION Million US $: 126 | Preliminary study phase included the study and evaluation of the existing transmission systems, future water demands, appraisal of existing hydrological studies and development of alternative solutions for ensuring adequate service to consumers. | | Top |
|